When I create a new dimension within a particular context (aka when viewing DB from a Workspace that reduces the scope of the said DB), I’d like that dimension to be automatically added to the workspace whitelist.
To date, I get an error message ; have to go through the “Admin” Workscape, edit the whitelist of the reduced-scope Workspace and go back to that Workspace to carry on working.
at the minimum, I feel newbies would be happier to get a warning that states
“new dimension out of scope of current Workscape”